Deprecated: iconv_set_encoding(): Use of iconv.internal_encoding is deprecated in /home/sapnaco/public_html/libraries/joomla/string/string.php on line 27

Deprecated: iconv_set_encoding(): Use of iconv.input_encoding is deprecated in /home/sapnaco/public_html/libraries/joomla/string/string.php on line 28

Deprecated: iconv_set_encoding(): Use of iconv.output_encoding is deprecated in /home/sapnaco/public_html/libraries/joomla/string/string.php on line 29

Warning: session_start(): Cannot send session cookie - headers already sent by (output started at /home/sapnaco/public_html/libraries/joomla/string/string.php:27) in /home/sapnaco/public_html/libraries/joomla/session/session.php on line 658

Warning: session_start(): Cannot send session cache limiter - headers already sent (output started at /home/sapnaco/public_html/libraries/joomla/string/string.php:27) in /home/sapnaco/public_html/libraries/joomla/session/session.php on line 658

Strict Standards: Only variables should be assigned by reference in /home/sapnaco/public_html/plugins/system/jsecure/jsecure.php on line 19

Strict Standards: Non-static method JPlugin::loadLanguage() should not be called statically in /home/sapnaco/public_html/plugins/system/jsecure/jsecure.php on line 23

Strict Standards: Only variables should be assigned by reference in /home/sapnaco/public_html/plugins/system/jsecure/jsecure.php on line 64

Strict Standards: Only variables should be assigned by reference in /home/sapnaco/public_html/plugins/system/jsecure/jsecure.php on line 136
Our Manager's References

Besides the above projects which have been consulted by SAPNA, our managers have been involved in different cement and lime projects during the past 30 years some of which are listed in below:

Item Description/ Position Client Capacity Year
1 Designer of part of equipment (e.g., rotary kiln and cooler, conveyors, bag filters) for production line Abadeh Cement Co. 500 tpd 1990-1992
2 Designing the part of equipment (e.g., Rotary cooler, conveyors, bag filters) for production line Ekbatan Cement Co. 500 tpd 1991-1994
3 Designer and project manager Ekbatan Cement Co. 500 tpd 1992-1995
4 Designer of crusher and material conveying systems in Kashan Tile Co. - 1992-1993
5 Consultant and designer of coating powder production line Ahakan Lime Powder Co. - 1993-1995
6 Designer of the hydrate lime’s production line Shargh Lime Co. - 1995-1996
7 Designer of tile glue production line Kashan Tile Co. - 1996-1997
8 Designer of dedusting system of the lime kiln Yazd Alloy Steel Co. - 1997-1999
9 Designer of preblending yard and raw material transportation system Neka Cement Co. 2000 tpd 1997-2000
10 Consultancy and engineering in complete plant Boushehr Cement Co. 3000 tpd 1998-2001
11 Project manager, Consultancy and engineering in complete plant Fars Now Cement Co. 3000/3400 tpd 2001-2005
12 Consultancy and engineering in equipment selection Shahr Kord Cement Co. 3000 tpd 2002-2003
13 Consultancy and engineering in complete plant Firouzkooh Cement Co. 3000/3500 tpd 2004-2006
14 Consultancy and engineering Bojnourd Cement Co. 3000 tpd 2003-2007
15 Consultancy and engineering for capacity upgrading project Abadeh Cement Co. 500 to 1200 tpd 2005-2007
16 Consultancy and engineering in complete plant Lamard Cement Co. 3800 tpd 2004-2007
17 Consultancy and engineering in complete plant Khouzestan Cement Co. 5500 tpd 2004-2009
18 Consultancy and engineering in capacity upgrading project Bojnourd Cement Co. 2100 to 2850 tpd 2006-2008
19 Consultancy and engineering in establishment of a new cement mill dept. Hormozgan Cement Co. 120 tph 2007-2008
20 Consultancy and engineering in capacity upgrading project Zarrin rafsanjan Cement Co. 700 to 850 tpd 2007-2008
21 Consultancy and engineering for equipment selection Neiriz Grey Cement Co. 3300 tpd 2007-2008
22 Consultancy and engineering in machinery selection Majd Khaf Cement Co. 3300 tpd 2007-2008
23 Consultancy and engineering in capacity upgrading project Benvid White Cement Co. 450 to 600 tpd 2008-2009
24 Technical advisor in project of conversion of gray cement production line to white cement Shargh Cement Co. 1000 tpd 2009-2011
25 Chief technical advisor for new production line no. 9 Tehran Cement Co. 3600 tpd 2009-2011
26 Technical advisor in establishment of a new cement grinding dept. Dashtestan Cement Co. 120 tph 2009-2010
27 Consultancy and engineering for equipment selection Gachsaran White cement Co. 1000 tpd 2010-2011
28 Chief technical advisor Darab Cement Co. 3600 tpd 2010-2011
29 Chief technical advisor Kordestan Cement Co. 3000 tpd 2010-2011